• Extension/reduction of load.
  • Equipment removal order [ERO].
  • Permanent disconnection [PD] / Temporary Disconnection [TD].
  • TOU Meter replacement / TOD 3 phase meter replacement.
  • Transformer [PMT] repair and installation.
  • PMT, Meter, 11 KVA Pole and Feeder relocation.
  • 11KVA Fuse and jumper reconnections.
  • Switchgears/Panels: design, fabrication, installation and connections.
  • Testing and commissioning.
  • Cable Trays, Raceway, Cable Routing and Cable ducting.
  • Design and implementation of illumination.
  • Earthing, Grounding and Lightening Protection.
  • Installation, testing and commissioning of generators, UPS, rectifiers and battery banks.
  • Design and construction of concrete foundations and boundary walls.